ProjectManager MCP server
Yes. ProjectManager publishes an official MCP server at https://api.projectmanager.com/api/mcp. It's hosted. It offers 33 tools. We last checked it on 22 Nov 2026.
Official: answers MCP requests at api.projectmanager.com, on ProjectManager's own domain projectmanager.com. Checked 22 Nov 2026. Maintained by Stuart Brameld.
Key facts
As of 22 Nov 2026, ProjectManager's official MCP server scores 55/100 (provisional) on MartechDB's Agent Readiness Index (v1.1). It answered 55 of our 55 checks in the last 90 days and lists 33 tools.
How the Agent Readiness Index works · Wrong? Suggest a correction
ProjectManager MCP server review
55/100
ProjectManager's MCP server scores 55/100 on MartechDB's Agent Readiness Index: usable by AI agents, with gaps.
The good
Hosted by ProjectManager: connect by URL, with nothing to install
Answered 100% of our checks in the last 90 days
The bad
Nothing we've found.
Not checked yet: how you sign in; a docs page listing its tools; what agent access costs. Anything not checked scores nothing.
Official MCP server
ProjectManager MCP server
- Address
- https://api.projectmanager.com/api/mcp
- Runs
- Hosted
- Sign-in
- Official MCP Registry
- Not listed
- How we know it's official
-
- Answers MCP requests at api.projectmanager.com, on ProjectManager's own domain projectmanager.com.
- Tools
- 33 tools · listed 22 Nov 2026
- First seen
- 1 Oct 2026
- Last checked
-
Reachable ·
16 Nov 2026: reachable17 Nov 2026: reachable18 Nov 2026: reachable19 Nov 2026: reachable20 Nov 2026: reachable21 Nov 2026: reachable22 Nov 2026: reachable
- Uptime
- 100% · 55 of 55 checks reachable since 1 Oct 2026
ProjectManager MCP server tools (33)
As the server lists them. Names and descriptions are the vendor's own.
-
get_linksGet Task LinksRetrieves the links from a task (as predecessor) to its successor tasks. Returns, per link, the successor task's ID, link type, and lag. Use this before update_link or delete_link to see a task's existing dependencies.
-
get_discussion_commentsGet Discussion CommentsRetrieves task discussion comments in a project with basic task context (task ID, name, board status column, percent complete) and author info (resource ID and name). Optionally filter by resource name, task name, or comment date range. Use get_projects first to resolve the project ID.
-
get_planned_progress_per_dayGet Planned Progress Per DayReturns the percentage of project progress that should be complete on each calendar day of a requested month when the project is exactly on schedule (zero ahead and zero behind). The calculation uses the currently saved plan, including task dates, durations, and the project calendar; it does not use historical series data or actual task progress. Use get_projects first to resolve the project ID.
-
update_taskUpdate TaskUpdates one or more fields on an existing task by its ID. Accepts the task name, description, percent complete, planned dates, duration, effort, material cost, colour theme, and milestone toggle. percentComplete must be between 0 and 100; plannedDuration and plannedEffort are measured in minutes; and plannedCost represents material cost only, not total cost. Use only a defined theme enum value. Only supplied fields are updated; omitted fields remain unchanged.
-
get_taskGet Task DetailsRetrieves full details for a single task by its ID, including name, description, status, assignee, due date, priority, theme, tags (tag names), parent project ID, planned and actual dates, costs, effort, WBS, a URL to open the task in ProjectManager, and any file attachments. File attachments are returned as an array containing the name, type, creation date, and a full download URL for each file. Share those file URLs so the user can click them. Do not download or fetch file contents yourself. Share the task URL when the user should open the task in PM. Use this when you already know the task ID. To search for tasks across a project or date range, use get_tasks instead. The project_id returned by this tool can be passed to get_task_statuses when updating a task's status. Planned and actual effort values are returned in minutes but should be displayed in hours and minutes (eg 1hr 30mins not 90mins). plannedCost and actualCost represent material costs only, the total cost of a task is m…
-
remove_task_tagsRemove Task TagsRemoves one or more tags from an existing task, preserving its other tags. Requires a task ID and tag names. Call get_task first to see the task's current tags, or get_tags to look up workspace tag names. Names are matched case-insensitively. Removing a tag that is not applied has no effect. This only detaches tags from this task; it does not delete or rename workspace tags or affect other tasks. Use add_task_tags to apply tags.
-
update_linkUpdate Task LinkUpdates the link type and lag of an existing task dependency (link) between a predecessor task (task_id) and its successor (successor_task_id) in the same ProjectManager project. This only affects scheduling within the project and does not connect to any external system. Both link_type and lag are required and fully replace the existing values. The previous values are not retained, so call get_links first if they may need to be restored. The dependency must already exist; use create_link to create one.
-
get_tasksGet List of TasksRetrieves a page of tasks, optionally filtered by project ID, task name, planned start date, due date, create date, assignees, creator, priority, percent complete, and/or tags. Returns task name, status, assignees, dates, creator, priority, percent complete, tags, and parent project for each result, plus totalCount - the number of tasks matching the filters, which is usually larger than the number returned - and hasMore. Tasks come back ordered by planned finish date, so a single page is only the earliest slice of the project, not the whole thing. Always take counts from totalCount rather than counting the returned tasks, and while hasMore is true keep calling with skip increased by the number of tasks already retrieved before answering anything about totals, date ranges, status breakdowns, or who is assigned to what. To retrieve a specific task by ID, including its file attachments, use get_task. To retrieve only tasks assigned to the current user, use get_my_tasks. Use get_tags to l…
-
update_task_statusUpdate Task StatusUpdates the status of a task by its ID. Requires a task_id and a task_status_id. Valid status IDs for a project can be retrieved using get_task_statuses. Always call that tool first to obtain the correct ID, as statuses are user-defined and vary per project. Do not guess or invent status IDs. If the user's intent maps to more than one plausible status, present the options and ask the user to confirm before proceeding.
-
get_projectGet Project DetailsRetrieves detailed information for a single project by ID, including schedule dates, progress, status, description, a URL to open the project in ProjectManager, and a consolidated list of all project and task file attachments (name, type, date, a full download URL, and task ID when attached to a task). Share file URLs so the user can click them. Do not download or fetch file contents yourself. Share the project URL when the user should open the project in PM. Use get_projects first to resolve a project ID from a name. Project ID is the project code (e.g. H2), not a GUID. File download URLs require the same authenticated session as this MCP connection.
-
get_projectsGet List of ProjectsRetrieves the list of projects in the workspace that the current user has access to, including their ID, name, and status. Project ID is the project code (e.g. H2). Use this before calling get_project, get_tasks, create_task, or create_project to resolve project IDs. If a user refers to a project by name, call this tool first to look up their project ID. If a name matches more than one project, present the options and ask the user to confirm before proceeding.
-
get_resourcesGet ResourcesRetrieves the list of available resources (team members) in the workspace, including their ID, name, and email address. Use this before calling create_project to resolve member IDs, or before calling create_task to resolve assignee IDs. If a user refers to a team member by name, call this tool first to look up their resource ID. If a name matches more than one resource, present the options and ask the user to confirm before proceeding.
-
update_projectUpdate ProjectUpdates one or more fields on an existing project. Accepts the project name, description, target completion date, manager, budget, and free-text status update. Use get_projects first to resolve the project ID. Use get_resources to resolve the manager ID. targetDate is the project's target planned completion date, budget is the proposed project budget, and statusUpdate is free-text progress information (it does not change the project's workflow status). Only supplied fields are updated; omitted fields remain unchanged.
-
set_task_parentSet Task ParentSets or changes the parent of an existing task, making it a sub-task of the specified parent. Requires a task_id and a parent_task_id. Use this to reorganise task hierarchy after tasks have already been created. To set a parent at creation time, use the parent_task_id parameter on create_task instead; that is more efficient when building a task list from scratch. Both the task and the parent task must belong to the same project.
-
get_project_membersGet Project MembersRetrieves the list of members on a project, including their resource ID, name, and permission level. Use get_resources to resolve member names to IDs when creating tasks. Call get_projects first to resolve the project ID (project code, e.g. H2).
-
create_linkCreate Task LinkCreates a task dependency (link) between two tasks in the same ProjectManager project: a predecessor task (task_id) and a successor task (successor_task_id). This only affects scheduling within the project and does not connect to any external system. Optionally accepts link_type (finishToStart, startToStart, finishToFinish, startToFinish; defaults to finishToStart) and lag (days of lag, or lead if negative; defaults to 0). Both tasks must be in the same project, cannot be the same task, cannot already be linked, and the successor cannot be a summary task or a descendant of a summary predecessor. Rejects dependencies that would create a circular dependency. Use get_tasks/get_task first to obtain valid task IDs.
-
remove_task_assigneesRemove Task AssigneesRemoves one or more resources from a task's assignees. Requires a task_id and a list of resource IDs. Call get_task first to see who is currently assigned via its assigneeIds field. Removing an assignee also discards any effort allocated to them on this task, and that effort is not restored if they are re-added. Confirm with the user before removing an assignee who has effort allocated. Removing a resource that is not currently assigned has no effect for that resource. Use add_task_assignees to assign resources instead.
-
create_taskCreate TaskCreates a new task within a specified project. Requires a task name and a project ID. Optionally accepts: assignees - a list of resource IDs to assign to this task, call get_resources first to resolve names to IDs; parent_task_id - the ID of a parent task, if this task should be a sub-task, use this to build task hierarchies at creation time, parent tasks must be created before their children; theme - a colour for the task, do not use values outside the defined enum; planned_start_date, planned_finish_date - date range for the task; priority - fixed enum values; description - free text description of the work. If assignees are supplied, ProjectManager sends each assignee an email notification by default, unless notifications have been turned off. Returns the newly created task ID. When building a full project task breakdown, create all top-level tasks first, then create sub-tasks passing the relevant parent_task_id.
-
delete_linkDelete Task LinkRemoves an existing task dependency (link) between a predecessor task (task_id) and its successor (successor_task_id) in the same ProjectManager project. This only affects scheduling within the project and does not connect to any external system. Only the dependency is removed; neither task is deleted. The dependency's link type and lag are not retained, so call get_links first if it may need to be recreated. The dependency must already exist.
-
get_project_tasksGet Project TasksReturns non-summary, non-milestone project tasks with planned start and finish dates, percent complete, planned and actual cost (material plus resource cost), planned and actual hours, and assignee names. Use this for per-task cost or hours charts and tables. Use filters to narrow results. plannedCost and actualCost are null when the current user does not have permission to see costs and budgets.
-
get_resource_workloadGet Resource WorkloadReturns workload summary per assignee on a project: open tasks, overdue tasks, completed tasks, total tasks, and percentComplete - completed tasks as a percentage of total tasks. Use percentComplete for a resource's Progress (%) in tables and charts; do not recalculate it.
-
add_task_assigneesAdd Task AssigneesAssigns one or more resources to a task, in addition to any resources already assigned. Requires a task_id and a list of resource IDs. Call get_resources first to resolve names to IDs, and get_task to see who is already assigned via its assigneeIds field. Assigning a resource that is already assigned to the task has no effect for that resource. Use remove_task_assignees to unassign resources instead. ProjectManager sends each newly assigned resource an email notification by default, unless this specific notification has been turned off.
-
get_meGet Current UserRetrieves the currently authenticated user's identity and workspace, including their ID, full name, and workspace name. Use this when you need to know who the current user is or which workspace they are in. No parameters are required.
-
get_project_metricsGet Project MetricsReturns pre-calculated project metrics for insights: EVM (BAC, PV, EV, AC, CPI, SPI), burndown series (remainingTasks, idealRemainingTasks, remainingHours, idealRemainingHours, tasksClosed per date), cost variance rows, cost/hours summary, progress s-curve points, and actualCostSeries - cumulative actual resource cost from timesheets by date, for actual cost over time lines. Call this before generating EVM, burndown, cost, or progress insight charts — use these values in tables and charts; do not recalculate. When the current user does not have permission to see costs and budgets, budget, evm, costVariances, actualCostSeries and the cost values in costHoursSummary are omitted; do not estimate or infer them.
-
create_projectCreate ProjectCreates a new project in the workspace. Returns the new project ID (project code, e.g. H2) and name. Use get_resources to resolve member IDs before granting access via member_ids. If member_ids is omitted, only the current user will have access. Requires workspace permission to create projects.
-
get_my_tasksGet My TasksRetrieves a page of tasks assigned to the currently authenticated user, optionally filtered by project ID, start date, and/or end date. Internally resolves the current user's identity; no user ID needs to be provided by the caller. Like get_tasks, it returns totalCount and hasMore alongside the page, ordered by planned finish date - take counts from totalCount and page through with skip while hasMore is true. Use this when the user asks about their own tasks, workload, or what they need to do next. For tasks across all users or assignees, use get_tasks. Returned priority values are numeric codes: null=None, 0=Very Low, 300=Low, 500=Medium, 700=High, 900=Very High, 1000=Critical. Display the human-readable priority name, not the numeric code.
-
get_tagsGet Workspace TagsRetrieves a page of available tags in the current workspace, including each tag's ID, name and colour. Includes tags that are not currently applied to any task. Optionally filter by a partial tag name. Results are ordered by name and include totalCount, skip and hasMore; while hasMore is true, increase skip by the number of tags retrieved to get the next page. Use this to resolve existing tag names before add_task_tags, remove_task_tags or filtering get_tasks by tags. Pass tag names, rather than IDs, to those tools. To see a particular task's applied tags, use get_task. This tool only looks up tags; it does not create, rename, recolour or delete them.
-
get_project_summaryGet Project SummaryReturns summary information about a project including name, dates, budget, task counts, and schedule health. budget is null when the current user does not have permission to see costs and budgets.
-
update_task_priorityUpdate Task PriorityUpdates the priority of a task by its ID. Accepts a task_id and a priority value. Use this when the user wants to raise or lower the urgency of a task. Priority values are fixed and do not vary per project; no lookup step is required.
-
get_task_statusesGet Task StatusesRetrieves the list of available task statuses for a given project. Accepts a project ID. Returns each status's ID and name. Use this before calling update_task_status to obtain a valid task_status_id. Statuses are user-defined per project and cannot be assumed. If you only have a task ID, call get_task first to retrieve its project_id, then pass that here.
-
get_overdue_tasksGet Overdue TasksReturns tasks that are overdue (past planned finish date and not 100% complete). Optionally filter by assignee name.
-
get_my_projectsGet Projects Managed by MeRetrieves projects where the currently authenticated user is the assigned manager. Internally resolves the current user's identity; no user ID needs to be provided. Use this when the user wants to see the projects they are responsible for managing, rather than all projects they have access to. For all accessible projects, use get_projects.
-
add_task_tagsAdd Task TagsAdds one or more tags to an existing task, preserving its other tags. Requires a task ID and tag names. Use get_tags to look up available workspace tags and get_task to see the task's current tags. Names are matched case-insensitively. A name that does not exist creates a workspace tag with an automatically chosen colour and applies it to the task; use an existing name when creation is not intended. Adding a tag already applied to the task has no additional effect. Use remove_task_tags to detach tags.
Connect your AI to ProjectManager
Add the official ProjectManager MCP server to Claude, ChatGPT or your editor.
Connect ProjectManager MCP to Claude
Claude.ai and Claude Desktop
Open Customize, then Connectors.
Click +, then Add custom connector.
Name it ProjectManager, paste the address below and click Add.
Connect ProjectManager MCP to ChatGPT
Open Settings, then Apps, then Advanced settings.
Turn on Developer mode, then click Create.
Name it ProjectManager and paste the address below.
ChatGPT usually only connects to servers with self-serve sign-in or none.
Connect ProjectManager MCP to Cursor
Opens Cursor if it's installed. If nothing happens, use the JSON below.
Connect ProjectManager MCP to VS Code
Opens VS Code if it's installed. Otherwise add the JSON settings from the Cursor tab to your .vscode/mcp.json.
ProjectManager MCP server questions
Does ProjectManager have an official MCP server?
Yes. ProjectManager publishes its MCP server itself. Its address is on ProjectManager's own domain (api.projectmanager.com). MartechDB only lists servers a vendor publishes, never community copies.
What is the ProjectManager MCP server URL?
The address is https://api.projectmanager.com/api/mcp.
How do I connect ProjectManager MCP to Claude, ChatGPT or Cursor?
In Claude, add https://api.projectmanager.com/api/mcp as a custom connector (Customize, Connectors, Add custom connector). In Cursor, use the Add to Cursor link on MartechDB's page, or paste the JSON settings into your mcp.json. In Claude Code, run: claude mcp add --transport http projectmanager https://api.projectmanager.com/api/mcp
What can the ProjectManager MCP server do?
It offers 33 tools, including get_links, get_discussion_comments, get_planned_progress_per_day, update_task and get_task (as listed on 22 Nov 2026). 19 are marked read-only and 6 can delete or overwrite data.
Is the ProjectManager MCP server in the official MCP Registry?
No. ProjectManager hasn't published it to the official MCP Registry.
Is the ProjectManager MCP server working?
Yes. It answered our most recent check. We last checked it on 22 Nov 2026.
What are the alternatives to ProjectManager's MCP server?
In Project management, the most agent-friendly alternatives with an official MCP server are Breeze (100/100), Akiflow (98/100), Fibery AI (98/100), Basecamp (97/100) and Scoro (97/100). ProjectManager scores 55/100 on the same index.
Alternatives to ProjectManager's MCP server
Vendors in Project management with an official MCP server, the most agent-friendly first. ProjectManager scores 55/100.
Compare all 59 Project management vendors →Change history
What we've seen change for ProjectManager, newest first.
-
ProjectManager: ProjectManager MCP server: 3 tools added (now 33)
-
ProjectManager: ProjectManager MCP server: 1 tool added (now 30)
Use with AI
Connect your AI to MartechDB
Then ask it about ProjectManager, or any of the 1,850 marketing tools with an official MCP server. Free, no sign-in.
Claude.ai and Claude Desktop
Open Customize, then Connectors.
Click +, then Add custom connector.
Name it MartechDB, paste the address below and click Add. There's no sign-in.
The free plan allows one custom connector. On Team and Enterprise plans, an owner adds the connector first.
Claude Code
Run this in your terminal:
ChatGPT
Open Settings, then Apps, then Advanced settings.
Turn on Developer mode, then click Create.
Name it MartechDB, paste the address below and choose No authentication.
Developer mode is on Plus and Pro plans, and on Business, Enterprise and Edu if an admin allows it.
API
The same data as JSON, with no sign-in. See the OpenAPI description for every endpoint and field.
CLI
Search the directory and print the command to connect a vendor's server, from your terminal. Needs Node 18 or later. View on npm
Show that your MCP server is verified
If you work at ProjectManager, add this badge to your MCP docs or README. It's free, it's the same for every vendor, and it updates from our daily checks: it shows uptime while the server responds, and says so if it stops.
Something wrong or out of date? Suggest a correction or email us, and we'll check it against the evidence. Every correction we make is listed on Corrections.